Power Plant Turbine
Profile
Category
- Alien Contact
- Subcategory
- Scan Data
- Entries in Scan Data
- 9
- Words
- 113
PDA entry
- Protein-marker scan complete. Analyzing tensors.
- Critical component of the Axum power plant codenamed "Karakorum" by pioneers. Before its sudden destruction, this turbine captured hot water flow to turn the generator. - Original turbine replaced by more advanced alloy upgrade approximately 300 years ago; coincides with switch to methane-burning power - Turbine destroyed by thermite fire 250 years ago: probable sabotage - Fabricating new turbine blades in place with the builder tool will require huge amounts of manganese alloys - If repaired, turbine could be linked to the titan rockbore below and power plant restarted
- Assessment: find source of necessary material for repairs with habitat builder tool, then connect turbine to hot water source and restart power plant
Related entries
The upper observatory tower has been extensively modified.
This pipe once channeled hot water from the titan rockbore below into the turbine above, spinning it to...
This tower was likely built as an observatory (best fit theory) or an above-water forge (low probability...
This model of an alien solar system contains two stars, seven planets, and three moons.
This enormous electrical power plant is a hybrid methane/hydroelectric design.
The "Rosetta Stone," named for an important archaeological discovery from pre-Expansion Earth, is a titanium...
This structure is not of human origin.
All major power plant systems are connected to this main control room.
Loading discussion...